Modernization of the gas network in Lublin

Modernization of the gas network in Lublin

Country
Poland

Project completion
2020

Place of application
gas network

Product
RC MULTIsafe® 2L gas pipes DN63-DN450

Description of the investment

Lublin in expansion. The new investment took place in the very center of the city, to be more precise
in the area of Al. Racławicka street. The works were carried out including replacement of the gas network on the section of the roundabout – Rondo Honorowych Krwiodawców and the junction with Lipowa street. The new gas network was created using RC MULTIsafe® 2L pipes, which are resistant to scratching and cracking. The pipes manufactured by RADPOL S.A. are fully PAS1075 certified. Due to their strenght parameters they are primarily intended for installation using alternative techniques (Burstlining), but they also work well for traditional installation because the sand pack is not required. The RC MULTIsafe® pipes are installed and jointed just like the typical PE100 pipes. They do not require removing the distinguishing layer, connected in a molecular way.

RC MULTIsafe® 2L pipes used as the replacement of the old gas pipeline in Lublin, are connected like typical PE 100 pipes. The photo shows the connection by butt welding.