04.09.2020 r.

Radpol as a supplier of pipes for the construction of transmission pipeline for crude oil

As part of the project of building a pipeline for the transmission of crude oil from the Well Zone to the Group Centre in Kamień Mały, RADPOL delivered over 20 kilometers of a full system (pipes, fittings and radially cross linked couplings with double sealing feature). According to the investor's guidelines, pre-insulated pipes and fittings have been additionally equipped with micro tubes for running the optical fibre.

Go to the article on our blog:

SEE MORE

 

THIS WEBSITE USE COOKIES. By continuing to use this website, you consent to our use of these cookies in accordance with the browser settings. Using our website without changing cookies settings shall mean that they will be stored in the memory of the device.
Close ×